Citect SCADA
Customer voice & ideas portal
Add a new idea
Filter by status
Submitted
11
Future Consideration
39
In Roadmap
6
In Development
1
Implemented
13
Unlikely to implement
19
Duplicate
0
Filter by category
Alarms
×
18
API & Connectivity
×
3
Architecture / Clustering
×
3
Development Tools
×
31
Drivers / Protocols
×
10
Equipment
×
11
Graphics / Visualization
×
21
Historic Data / Storage
×
4
Kernel & Diagnostics
×
2
Other
×
26
Trends
×
0
Log in / Sign up
Identify yourself with your email address
Email address
Recent
Trending
Popular
74
Vote
Add my vote +1
+2
+3
+4
+5
Copy+Paste items inside Equipment editor
If we need to add an equal or similar item to several equipments we need to type everything, or if we have several tags in the same equipment and want to add an alarm to all of them, it should be useful to copy the alarm part from one item to othe...
Created 23 Mar 10:49am
Development Tools / Equipment
1
Future Consideration
70
Vote
Add my vote +1
+2
+3
+4
+5
Remove the Need for pg* Files
Eliminate the requirement for pg*.dbf files. These files are not really needed as the same info is in the .ctg files. These files make it difficult to use PlantSCADA with version control, such as SVN or git since either these files need to be vers...
Created 20 May 01:11pm
Graphics / Visualization
1
54
Vote
Add my vote +1
+2
+3
+4
+5
Trend history file modification
Currently any change to a trend in Citect means having to discard the trend history files, for example changing the Sample Period. Would it be possible to have Citect modify the history files automatically? There are tools in the Toolbox to achiev...
Created 9 Apr 05:09am
Alarms
1
Future Consideration
46
Vote
Add my vote +1
+2
+3
+4
+5
Native MQTT Client
I think it is usefull to add a native MQTT client to Plant SCADA.
Created 10 Aug 08:40am
API & Connectivity
4
In Roadmap
45
Vote
Add my vote +1
+2
+3
+4
+5
Version Control
Citect desperately needs an integrated version control system. I understand that there are third party applications out there (MDT, Version Dogg), but they are not ideal. It would be great if the application could wrap around Git or SVN. And an ab...
Created 4 Nov 12:09am
Other
1
In Development
44
Vote
Add my vote +1
+2
+3
+4
+5
Process Analyst connects to WW Historian
Process Analyst can connect to Citect Historian ,ref to picture. Then is should be possible to connect to Aveva Historian alias WW Historian.
Created 26 Aug 01:26pm
Alarms
0
In Roadmap
35
Vote
Add my vote +1
+2
+3
+4
+5
Unify automatic generation of Configuration Parameters in Plant SCADA Studio 2023 and Equipment Editor
Currently when adding new Equipment through Equipment Editor, all relevant Configuration Parameters will be generated automatically and are available in Plant SCADA Studio 2023. However if you add a new Equipment in Plant SCADA Studio and run "Upd...
Created 17 Feb 01:58pm
Equipment
1
33
Vote
Add my vote +1
+2
+3
+4
+5
Search and replace inside Equipment Editor
When we have diferent equipments with same comun branch and need to change them all, its a lot of work, because we need t go to each equipment open it search the item, open it and change.
Created 23 Mar 10:44am
Development Tools / Equipment
0
Future Consideration
31
Vote
Add my vote +1
+2
+3
+4
+5
Add ability to lock guidelines in Graphics Builder (so they dont change when you accidentally click them)
The problem is: in the graphics builder the guidelines can be clicked or dragged using the mouse, and then they change! Whilst dragging is quite a conscious action, clicking something is easily done accidentally. You are not warned that you clicke...
Created 14 Dec 02:54pm
Graphics / Visualization
1
Unlikely to implement
30
Vote
Add my vote +1
+2
+3
+4
+5
Improvements of the deployment functionality
Deploying a project can be slow, especially upoading a new version of the project. A progression bar with remaining time would be nice. Would be a nice feature if you could upload the complete project including the configuration files. Have an opt...
Created 20 Jan 07:44am
Development Tools
5
1
2
3
4
5
…
Next ›
Last »